Hardware Commissioning and Dry-Run Test Procedure Template
Description
Short bullet point list description of should be achieved, images, and other pertinent information
- result 1 (→ step 1)
- result 2 (→ step 2)
- result 3 (→ step 3)
Procedure
Step | S? | short description | Criteria |
prepare | | init device status handler | |
step1 | | check simple IP connectivity | |
step2 | | check availability of RDA nameserver | |
(N.B. S?: skippable task: yes can be skipped by operator (or converted to warning in sequencer's 'lenient mode')
Details of Test Steps
N.B. detailed 'cookbook': check list of individual steps (settings, gains, …):
Step S.x.1 result 1 (as described above)
- step 1 (pictures, links, and references possible)
- sub-step 1.1
- sub-step 1.2
- sub-step 1.3
- step 2
- step 3
Step S.x.2 result 2 (as described above)
- step 1
Step S.x.2 result 2 (as described above)
- step 1
Problems
List of possible problems and first-order remedies:
- short problem description #1
- short problem description #2
Exit conditions
clear definition of handover specs
List of systems to be considered “operational” afterwards
| Exit Condition
|
O.A.x.1 | exit condition 1 |
O.A.x.2 | exit condition 2 |
.01 | sub-system 1 |
.02 | sub-system 2 |
.03 | sub-system 3 |
O.A.x.3 | exit condition 3 |
.01 | |
Notes on Exit Conditions
- …
Open Questions & Action Items
things that are not yet discussed, or integrated into the procedure
References
- <reference #1 title>, author, date, source link
- <reference #2 title>, author, date, source link
Acronyms
Acronyms
Abbreviation | alt. | English | German |
BPC | BeamProductionChain | Beam Production Chain | |
BPM | | Beam Position Monitor | Strahllage Monitor, Positions Sonde |
COD | | Closed Orbit Dipole (Steerer) | Strahllage Korrektur Magnet |
DCCT | | Direct Current (DC) - Curent Transformer | |